Use this factor to estimate the overhead time which the parallel build mechanism can introduce. With this factor, the es

Post Reply
mamorani
Posts: 8800
Joined: Thu Feb 25, 2021 6:50 pm
Contact:

Use this factor to estimate the overhead time which the parallel build mechanism can introduce. With this factor, the es

Post by mamorani »

Use this factor to estimate the overhead time which the parallel build mechanism can introduce. With this factor, the estimated build time including overhead for a model is (1+overhead factor)*(time to build this model with a signal core). This factor must be

advisor
Post Reply

Who is online

Users browsing this forum: No registered users and 1 guest