Page 1 of 1

Use this factor to estimate the overhead time which the parallel build mechanism can introduce. With this factor, the es

Posted: Sun Mar 07, 2021 6:31 pm
by mamorani
Use this factor to estimate the overhead time which the parallel build mechanism can introduce. With this factor, the estimated build time including overhead for a model is (1+overhead factor)*(time to build this model with a signal core). This factor must be

advisor