CPLEX Code of PhD thesis (Multi Objective Robust Aggregate Production Planning in a Supply Chain under Uncertainty)

$46

Description

Department of Industrial Engineering

  

Multi Objective Robust Aggregate Production Planning in a Supply Chain under Uncertainty

 

 

A Thesis Submitted in Partial Fulfillment of the Requirement for the Degree of Doctor of Philosophy in Industrial Engineering

Abstract

Aggregate production planning in a supply chain is one of the most important activities in the field of planning in leading companies. In this research, several novel aggregate planning models in a supply chain are proposed under uncertainty by the help of multi-objective mathematical programming approach. The proposed models are including two main steps: at first step; some critical decisions about pre-production phase are made such as determining quantity and method of supply and associated logistics and transportation planning, and determining production rate and human resource planning. In the next step, after the realization of first step decisions, we decide about quantity and method of holding inventory, distribution of the end product to the customers and associated transportation planning. The first step decisions are made based on the value of the predicted parameter while the second step decisions are made based on the revealed values of parameters.

The objective functions of the proposed models are as follows:

  • Minimizing total losses of supply chain including production cost, hiring, firing and training cost, raw material and end product inventory holding cost, transportation and shortage cost
  • Considering customer satisfaction through minimizing the sum of the maximum amount of shortages among the customers’ zones in all periods.
  • Maximizing the worker’s productivity through training courses that could be held during the planning horizon.
  • Minimizing the risk and variability of the plans due to the uncertain nature of the supply chain.

the proposed models have the following features: (i) the majority of supply chain cost parameters are considered; (ii) quantity discounts to encourage the producer to order more from the suppliers in one period, instead of splitting the order into periodical small quantities, are considered; (iii) the interrelationship between lead time and transportation cost is considered, as well as that between lead time and greenhouse gas emission level; (iv) demand uncertainty is assumed to follow from a pre-specified distribution function; (v) shortages are penalized by a general multiple breakpoint functions, to persuade producers to reduce backorders as much as possible; (vi) some indicators of a green supply chain, such as greenhouse gas emissions and waste management are also incorporated in to the models.

Finally, the proposed models are solved using the exact methods (standard packages CPLEX, LINGO, AUGMECON), simulation method, heuristic method (combination of augmented epsilon-constraint, L-shaped and extended Monte Carlo sampling methods) and metaheuristic method (combination of augmented epsilon-constraint method and Genetic algorithm). By applying the proposed models on a real case study from CHOUKA company also on the numerous randomly generated problems, and comparing the solutions of the proposed methods with the results obtained from the standard packages, the applicability, practicability and efficiency of the proposed methods and mathematical models are demonstrated.

Keywords: Aggregate production planning, supply chain planning, uncertainty, multi-objective optimization, robust stochastic programming

references :

Akinc, U., and Roodman, G.M. (1986) “A new approach to aggregate production planning”, IIE Transactions 18, 88- 94.

Anderson, E.J., Lagodimos, A.G.(1989),” Service levels in singlestage MRP systems with demand uncertainty”, Engineering Costs and Production Economics 17, 125–133.

Armacost, R.L., Penlesky, R, J., and Ross, S.C. (1990),”Avoiding problems inherent in spreadsheet-based simulation models: An aggregate planning application”, Journal of Production and Inventory Management 31, 62-67.

Bai, C., &  Sarkis, J. (2010). Green supplier development: analytical evaluation using rough set theory. Journal of Cleaner Production, 18(12), 1200-1210.

Baker, K.R., Dixon, P., Magazine, M.J., and Silver, E.A. (1978), “An algorithm for the dynamic lot-size problem with time-varying production capacity constraints”, Management Science 24, 1710-1720.

Barman, S., and Burch, E.E. (1989), “‘The production switching heutristic: A practical revision”, International Journal of Production Research 27, 1863-1875.

Behnezhad, A.R., and Khoshnevis, B. (1982), “The effects of manufacturing progress function on machine requirements and aggregate planning problems”, International Journal of Production Research 20, 309-325.

Bellman, R., Zadeh, L. (1970),” Decision making in a fuzzy environment”, Management Science 17, 141–164.

Ben-Tal, A., Nemirovski, A. (2000), “Robust solutions of linear programming problems contaminated with uncertain data”, Math. Program, 88 411–424,

Bergstrom, G.L., and Smith, B.E. (1970), “Multi-item production planning – An extension of the HMMS rule“, Management Science 16, B614-B629.

Billington, P.J., Mcclain, J.O., Thomas, L.J. (1983),” Mathematical programming approaches to capacity constrained MRP systems: Review, formulation and problem reduction”, Management Science 29, 1126–1141.

Bishop, G.T. (1957), “On a problem of production scheduling”, Operations Research 5, 97-108.

Bitran, G., Yanesse, H.(1984),” Deterministic approximation to stochastic production problems“, Operations Research 32, 999–1018.

Bowman, E.H. (1956), “Production scheduling by the transportation method of linear programming“, Operations Reasearch 4, 100-103.

Bowman, E.H. (1963), “Consistency and optimality in mapagerial decision making”, Management Science 9, 310-321. Büchel, A. (1983), “Stochastic material requirements planning for optional parts”, International Journal of Production Research 21, 511–527.

Buffa, E.S., and Taubert, W.H. (1967), “Evaluation of direct computer search methods for the aggregate planning problem”, Industrial Management Review Fall Issue, 19-28.

Burstein, M.C., Nevision, C.H., Carlson, R.C. (1984), “Dynamic lot-sizing when demand timing is uncertain”, Operations Research 32, 362–379.

Callarman, T.E., Hamrin, R.S. (1983),” A comparison of dynamic lot sizing rules for use in a single stage MRP system with demand uncertainty”, International Journal of Operations and Production Management 4, 39–48.

Carlson, R.C., Yano, C.A. (1986),” Safety stocks in a MRP. Systems with emergency setups for components”, Management Science 32, 403–412.

Chang, R.H., and Jones, C.M. (1970), “Production and workforce scheduling extensions”, AIIE Transactions 2, 326- 333.

Charnes, A., Cooper, W.W., and Mellon, B. (1955), “A model for optimizing production by reference to cost surrogates”, Econometrica 23, 307-323.

Chu, W., Dyer, JH, (2000), “The determinants of trust in supplier-automaker relationships in the USA, Japan, and Korea”, Journal of International Business Studies, 31 (2), pp.259-85

Close, J.F.C. (1968), “A simplified planning scheme for the manufacturer with seasonal demand”, Journal of Industrial Engineering 19, 454-462.

Coker, J.L. (1985), “Analyzing production switching heuristics for aggregate planning models via an application”, Prod. & Inven. Mgmt. 26, 1-13.

De Bodt, M.A., Wassenhove, L.N. (1983), ” Cost increases due to demand uncertainty in MRP lot sizing”, Decision Science 14, 345–362.

Deckro, R.F., and Hebert, J.E. (1984), “Goal programming approaches to solving linear decision rule based aggregate production planning models”, IIE Transactions 16, 308- 315.

Diabat, A., & Govindan, K. (2011). An analysis of the drivers affecting the implementation of green supply chain management. Resources, Conservation and Recycling, 55(6), 659-667.

Diks, E.B., De Kok, A.G. (1996), “Multi-echelon systems: a service measure perspective”, European Journal of Operational Research 95, 241–263.

Dolgui,  A., and Ould-Louly M.A., (2002), A model for supply planning under lead time uncertainty, International Journal of Production Economics 78(2), 145-152.

Du T.C-T., Wolfe P. M., (2000). Building an active material requirements planning system,  International Journal of Production Research, 38(2), 241-252(12)

Dzielinski, B.P., Baker, C.T., and Manne, A.S. (1963), “Simulation tests of lot size programming”, Management Science 9, 29-258.

Ebert, R.J. (1976), “Aggregate planning with learning curve productivity” Management Science 23, 171 – 182.

Eilon, S. (1975), “Five approaches to aggregate production planning”, AIlE Transactions 7, 118-131.

Elmaleh, J., and Eilon, S. (1974), “A new approach to production switching”, International Journal of Production Research, 12, 673-681.

Eltayeb, K., Zailani, S., & Ramayah, T. (2011). Green supply chain initiatives among certified companies in Malaysia and environmental sustainability. Investigating the outcomes Resources, Conservation and Recycling, 55, 495–506.

Eppen, G., Schrage, L. (1981),” Centralized ordering policies in a multi-warehouse system with lead times and random demand“, In: Schwarz, L. (Ed.), Multi-Level Production/Inventory Control Systems: Theory and Practice, vol. 16. Studies in Management Science, North-Holland, Amsterdam, pp. 51–67.

Eppen, G.D., Martin, R.K., Schrage, L.(1989),” A scenario approach to capacity planning”, Operations Research 37, 517–527.

Escudero, L.F. (1994). “CMIT, Capacitated Multi-level Implosion Tool”, European Journal of Operational Research 76, 511–528.

Escudero, L.F., Kamesam, P.V. (1993), “MRP modelling via scenarios”, In: Ciriani, T.A., Leachman, R.C. (Eds.), Optimization in Industry. Wiley, New York, pp. 101–111.

Escudero, L.F., Kamesam, P.V. (1995), “On solving stochastic production planning problems via scenario modelling”, TOP 3, 69–95.

Escudero, L.F., Kamesam, P.V., King, A.J., Wets, R.J.B. (1993), “Production planning via scenario modelling”, Annals of Operations Research 43, 311–335.

Federgruen, A., Zipkin, P. (1984), “Approximation of dynamic, multi-location production and inventory problems”, Management Science 30, 69–84.

Fetter, R.B. (1962), “A Linear Programming model for long range capacity planning”, Management Science 8, 327-334.

Florian, M., and Robillard, P. (1971), “An implicit enumeration algorithm for the concave cost network flow problem”, Management Science 18, 184-193.

Fox, M.S., Barbuceanu, M., Teigen, R. (2000), “Agent-oriented supply chain management”, International Journal of Flexible Manufacturing Systems 12, 165–188.

Galbraith, J., (1973), “Designing Complex Organizations”, Addison-Wesley, Reading, MA.

Gallego,G.,(2001),lecturenote,IEOR4000:ProductionManagement,Lecture5 / http://columbia.edu/_gmg2/4000/pdf/lect_05.pdfS.

Ganeshan, R. (1999), “Managing supply chain inventories: a multiple retailer, one warehouse, multiple supplier model”, International Journal of Production Economics 59, 341–354.

Gaver, D.P. (1961), “Operating characteristics of a simple production, inventory-control model”, Operations Research 9, 635-649.

Gfrerer, H., Zäpfel, G. (1995), “Hierarchical model for production planning in the case of uncertain demand”, European Journal of Operational Research 86, 142–161.

Gilgeous, V. (1989), “Modelling realism in aggregate planning: A goal-search approach, International Journal Production Research 27, 1179- 1193.

Goodman, D.A. (1973), “A new approach to scheduling aggregate production and work force”, AIIE Transactions 5, 135-141.

Goodman, D.A. (1974a), “A sectioning search approach to aggregate planning of production and work force”, Decision Science 5, 545-563.

Goodman, D.A. (1974b), “A goal programming approach to aggregate planning of production and work force”, Management Science 20, 1569-1575.

Grasso, E.T., Taylor, B.W. (1984), “A simulation-based experimental investigation of supply/timing uncertainty in MRP systems” International Journal of Production Research 22, 485–497.

Grubbström, R.W. (1999a), “New developments within MRP theory”, Second International Aegean Workshop on the Analysis and Modelling of Manufacturing Systems. 52-61

Grubbström, R.W. (1999b), “A net present value to approach to safety stocks in a multi-level MRP system”, International Journal of Production Economics 59, 361–375.

Grubbström, R.W., Tang, O. (1999),” Further developments on safety stocks in a MRP system applying Laplace transforms and input–output analysis”, International Journal of Production Economics 60–61, 381–387.

GUIDE, VDR, JR. (2000), “Production Planning and Control for Remanufacturing: Industry Practice and Research Needs,” Journal of Operations Management, 18(4), 467-483.

Gupta, A., Maranas, C.D. (2003), “Managing demand uncertainty in supply chain planning”, Computers and Chemical Engineering 27, 1216–1227.

Hall, R.W. (1988), “Graphical techniques for planning changers in production capacity”, International Journal Production Research 26, 675-689.

Hamner, W.C., and Carter, P.L. (1975), “A comparison of alternative production management coefficient decision rules”, Decision Science 6, 324-336.

Hanssmann, F., and Hess, S.W. (1960), “A Linear Programming approach to production and employment scheduling”, Management Technology 1, 46-54.

Hax, A.C., Meal, H.C., (1975), ” Hierarchical Integration of Production Planning and Scheduling”, In: Geisler (Ed.), Logistics: Studies in the Management Science, vol. 1. Elsevier, North Holland.

Hax, A.C., and Candea, D. (1984), Production and Inventory Management, Prentice-Hall, Englewood Cliffs, NJ.

Hegseth, M.A. (1984), “The challenge of operation yield”, Production and Inventory Management 25, 4–10.

Ho, C. (1989), “Evaluating the impact of operating environments on MRP system nervousness”, International Journal of Production Research 27, 1115–1135.

Hoffman, A.J., and Jacobs, W. (1954), “Smooth patterns of production”, Management Science l, 86-91.

Hojati, M. (2004), “Bridging the gap between probabilistic and fuzzy-parameter EOQ models“, International Journal of Production Economics 91, 215–221.

Holt, C.C., Modigliani, F., and Simon, H.A. (1955), “A linear decision rule for production and employment scheduling“, Management Science 2, 1-30.

Holt, C.C., Modigliani, F., and Muth, J.F. (1956), “Derivation of a linear decision rule for production and employment”, Management Science 2, 159-177.

Hooke, R., and Jeeves, T.A. (1961), “Direct search solution of numerical and statistical problems”, Journal of the Association for Computing Machinery 8, 212-229.

Hsu, H., Wang, W. (2001), “Possibilistic programming in production planning of assemble-to-order environments”, Fuzzy Sets and Systems 119, 59–70.

Huang, P.Y., Rees, L.P., Taylor, B.W. (1985), “Integrating the MRP-based control level and the multistage shop level of a manufacturing system via network simulation”, International Journal of Production Research 23, 1217–1231.

Hwang, C.L., Fan, L.T., and Erickson, L.E. (1967), “Optimum production planning by the maximum principle”, Management Science 13, 751-755.

Jaikumar, R. (1974), “An operational optimization procedure for production scheduling”, Computer & Operation Research l, 191-198.

Jamalnia, A. and Soukhakian M. A. (2009), ” A hybrid fuzzy goal programming approach with different goal priorities to aggregate production planning“, Computers & Industrial Engineering 56, 1474–1486.

John, R.S. (1985), “The cost of inflated planned lead times in MRP systems”, Journal of Operations Management 5, 119–128.

Johnson, S.M. (1957), “Sequential production planning over time at minimum cost”, Management Science 3, 435-437.

Johnson, S., and Dantzig, G. (1955), “A production smoothing problem”, Proceedings of the 2nd Symposium in Linear Programming 151-176.

Jones, C.H. (1967), “Parametric Production Planning”, Management Science 13, 843-866.

Kacprzyk, J., Staniewski, P. (1982), “Long-term inventory policymaking through fuzzy decision-making models”, Fuzzy Sets and Systems 8, 117–132.

Kadipasaoglu, S.N., Sridharan, V. (1997), “Measurement of instability in multi-level MRP systems”, International Journal of Production Research 35, 713–737.

Karabuk, S., Wu, D. (1999), “Coordinating strategic capacity planning in the semiconductor industry”, Technical Report 99T-11, Department of IMSE, Lehigh University.

Karush, W. (1958), “On a class of minimum cost problems”, Management Science 4, 136-153.

Karush, W., and Vazonyi, A. (1957), “Mathematical programming and service scheduling”, Management Science 3, 140-148.

Kelle, P., Milne, A. (1999), “The effect of (s,S) ordering policy on the supply chain”, International Journal of Production Economics 59, 113–122.

Khoshnevis, B., Wolfe, P.M., and Terrell, M.P. (1982), “Aggregate planning models incorporating productivity – An overview”, International Journal of Production Research, 20, 555-564.

Kira, D., Kusy, M., Rakita, I. (1997), “A stochastic linear programming approach to hierarchical production planning”, Journal of the OR Society 48, 207–211.

Khoshnevis, B., and Wolfe, P.M. (1983a), “An aggregate production planning model incorporating dynamic productivity: Part 1, Model development”, IIE Transactions 15, 111-118.

Khoshnevis, B., and Wolfe, P.M. (1983b), “An aggregate production planning model incorporating dynamic productivity: Part 2, Solution methodology and analysis”, IIE Transactions 15, 283-295.

Klein, M, (1961), “On production smoothing”, Management Science 7, 286-293.

Koutsoukis, N.S., Dominguez-Ballesteros, B., Lucas, C.A., Mitra, G. (2000), “A prototype decision support system for strategic planning under uncertainty”, International Journal of Physical Distribution and Logistics Management 30, 640–660.

Kunreuther, H. (1969), “Extensions of Bowman’s theory on managerial decision-making”, Management Science 15, B415-B439.

Kurtulus, I., Pentico, D.W. (1988), “Material requirement planning when there is scrap loss”, Production and Inventory Management 29, 18–21.

Langenhoff, L.J.G., Zijm, W.H.M. (1990), “An analytical theory of multi-echelon production/distribution systems”, Statistica Neerlandica 44, 149–174.

Lario, F.C., Rodriguez, A., Garcia, J.P., Escudero, L.F. (2001), “Analysis and definition of scenarios in stochastic programming for supply chain management in the automobile sector”, IV Conference on Organization Engineering (CIO 2001), Sevilla (Spain).

Laurent, G. (1976), “A note on range programming: Introducing a satisficing range in an L.P.”, Management Science 22, 713-716.

Lawrence, K.D., and Burbridge, J.J. (1976), “A multiple goal linear programming model for coordinated production and logistics planning”, International Journal of Production Research, 14, 215-222.

Lee, S.M. (1972), Goal Programming for Decision Analysis, Auerbach, Philadelphia.

Lee, W.B., and Khumawala, B.M. (1974), “Simulation testing of aggregate production planning models in an implementation methodology”, Management Science 20, 903-911.

Lee, S.M., and Moore, L.J. (1974), “A practical approach to production scheduling”, Journal of Production and Inventory Management 15, 79-92.

Lee, D.R., and Orr, D. (1977), “Further results on planning horizons in the production smoothing problem”, Management & Science 23, 490-498.

Lee, Y.Y., Kramer, B.A., Hwang, C.L. (1990), ” Part-period balancing with uncertainty: a fuzzy sets theory approach”, International Journal of Production Research 28, 1771–1778.

Lee, Y.Y., Kramer, B.A., Hwang, C.L. (1991), “A comparative study of three lot-sizing methods for the case of fuzzy demand”, International Journal of Operations and Production Management 11, 72–80.

Leitch, R.A. (1974), “Marketing strategy and the optimal production schedule”, Management Science 21,302-312.

Lehtimäki, A.K. (1987), “An approach for solving decision problems of master scheduling by utilizing theory of fuzzy sets”, International Journal of Production Research 25, 1781–1793.

Lippman, S.A., Rolfe, A.J., Wagner, H.M., and Yuan, J.S.C. (1967a), “Optimal production scheduling and employment smoothing with deterministic demands”, Management Science 14, 127-158.

Lippman, S.A., Rolfe, A.J., Wagner, H.M., and Yuan, J.S.C. (1967b), “Algorithms for optimal production scheduling and employment smoothing”, Operations Research, 15, 1011-1029.

List G. F., Bryan Wood, Linda K. Nozick, Mark A. Turnquist, Dean A. Jones, Edwin A. Kjeldgaard, Craig R. Lawton, (2003), Transportation Research Part E 39 , 209–227

Lockett, A.G., and Muhlemann, A.P. (1978), “A problem of aggregate scheduling an application of goal programming”, International Journal of Production Research, 16, 127-135.

Lowe, T.J., Schwarz, L.B. (1983), “Parameter estimation for the EOQ lot-size model: Minimax and expected value choices”, Naval Research Logistics Quarterly 30, 367–376.

Leung C.H., Chan S.W. (2009), “A goal programming model for aggregate production planning with resource utilization constraint”, Computers & Industrial Engineering 56, 1053–1064.

Manne, A.S. (1957), “A note on the Modigliani-Hohn production smoothing model”, Managemem Science 3, 371- 379.

Marlin, P.G. (1986), “A MRP/job shop stochastic simulation model”, In: Lev, B. (Ed.), Production Management: Methods and Studies. North-Holland, Amsterdam, pp. 163–172.

McClain, J., and Thomas, J. (1977), “Horizon effects in aggregate production planning with seasonal demand”, Management Science 23, 728-736.

Meij, J.T. (1980), “Separable programming as a solution methodology for aggregate production planning”, International Journal of Production Research, 18, 233-243.

Mellichamp, J.M., and Love, R.M. (1978), “Production switching heuristics for the aggregate planning problem”, Management Science 24, 1242-1251.

Melnyk, S.A., Piper, C.J. (1985), “Lead time errors in MRP: The lot-sizing effect”, International Journal of Production Research 23, 253–264.

Meybodi, M., Foote, B. (1995), “Hierarchical production planning and scheduling with random demand and production failure”, Annals of Operations Research 59, 259–280.

Miller, W.A., Leung, L.C., Azhar, T.M., Sargent, S. (1997), “Fuzzy production planning model for fresh tomato packing”, International Journal of Production Economics 53, 227–238.

MirHassani, S.A., Lucas, C., Mitra, G., Messina, E.,Poojari, C.A., (2000). Computational solution of capacity planning models under uncertainty. Parallel Computing 26, 511–538.

Modigliani, F., and Hohn, F.E. (1955), “Production planning over time and the nature of the expectation and planning horizon”, Econometrica 23, 46-66.

Mula, J. (2004), “Models for production planning under uncertainty. Application in a company of the automobile sector”, Ph.D (in Spanish), Polytechnic University of Valencia, Spain. ISBN: 84-688-6987-2.

Mula, J., Poler, R., Garcia, J.P., Ortiz, A. (2005), “Demand uncertainty effects on first tier suppliers of an automobile industry supply chain”, The ICFAI Journal of Supply Chain Management 2 (3), 19–39.

Mula, J., Poler, R., Garcia, J.P. (2006), “MRP with flexible constraints: A fuzzy programming approach”, Fuzzy Sets and Systems 157, 74–97.

Mulvey, J.M., Ruszczynski, A. (1995), “A new scenario decomposition method for large-scale stochastic optimization”, Operations Research 43, 477–490.

Nelson, R.T. (1966), “Labor assignment as a dynamic control problem”, Operations Research 14, 369-376.

Oliff, M.D,, and Bruch, E.E. (1985), “Multi-product production scheduling at Owens-Coming Fiberglas”, Interfaces 15, 25-34.

Oliff, M.D., and Leong, G.K. (1987), “A discrete production switching rule for aggregate planning”, Decision Science 18, 582-596.

Oliff, M.D., Lewis, H.S., and Markland, R.E. (1989), “Aggregate planning in crew-loaded production environments”, Journal of Computers and Operation Research 16, 13-25.

O’Grady, P.J., and Byrne, M.D. (1986), “A combined switching algorithm and linear decision rule approach to production planning”, International Journal of Production Research, 24, 285-296.

Orr, D. (1962), “A random walk production-inventory policy: Rationale and implementation”, Management &Science 9, 118-122.

Orrbeck, M.G., Schuette, D.R., and Thompson, H.E. (1968), “The effect of worker productivity on production smoothing”, Management Science 14, B332-B342.

Ould-Loudy, M.A., Dolgui, A. (2004), “The MPS parameterization under lead time uncertainty”, International Journal of Production Economics 90, 369–376.

Paraskevopoulos, D., Karakitsos, E., Rustem, B. (1991), “Robust capacity planning under uncertainty”, Management Science 37, 787–800.

Park, K.S. (1987), “Fuzzy-set theoretic interpretation of economic order quantity”, IEEE Transactions on Systems, Man and Cybernetics 17, 1082–1084.

Petrovic, D. (2001), “Simulation of supply chain behavior and performance in an uncertain environment“, International Journal of Production Economics 71, 429–438.

Petrovic, D., Roy, R., Petrovic, R. (1998), “Modelling and simulation of a supply chain in an uncertain environment”, European Journal of Operational Research 109, 299–309.

Petrovic, D., Roy, R., Petrovic, R. (1999), “Supply chain modeling using fuzzy sets“, International Journal of Production Economics 59, 443–453.

Porter, B., Mak, K.L., Wong, Y.S. (1995), “Machine requirements planning and workload assignment using genetic algorithms”, IEEE International Conference on Evolutionary Computation. Perth, Western Australia, November.

Posner, M.E., and Szwarc, W. (1983), “A transportation type aggregate production model with backordering”, Management Science 29, 188-199.

Rakes, T.R., Franz, L.S., and Wynne, A.J. (1984), “Aggregate production planning using chance-constrained goal programming”, International Journal of Production Research 22, 673-684.

Remus, W.E. (1978), “Testing Bowman’s managerial coefficient theory using a competitive gaming environment”, Management Science 24, 827-834.

Reynoso, G., Grabot, B., Geneste, L., Verot, S. (2002), “Integration of uncertain and imprecise orders in MRPII”, Ninth International Multi-Conference on Advanced Computer Systems, Conference on Production System Design, Supply Chain Management & Logistics, Miedzyzdroje, Pologne, October 23–25.

Rinks, D.B. (1981), “A heuristic approach to aggregate production scheduling using linguistic variables”, In: Lasker, G.E. (Ed.), Applied Systems and Cybernetics, vol. VI. Pergamon Press, New York, pp. 2877–2883.

Rinks, D.B. (1982a), “The performance of fuzzy algorithm models for aggregate planning under differing cost structures”, In: Gupta, M.M., Sanchez, E. (Eds.), Fuzzy Information and Decision Processes. North-Holland, Amsterdam, pp. 267–278.

Rinks, D.B. (1982b), “A heuristic approach to aggregate planning production scheduling using linguistic variables: Methodology and application”, In: Yager, R. (Ed.), Fuzzy Set and Possibility Theory. Pergamon Press, New York, pp. 562–581.

Rosling, K. (1989), “Optimal inventory policies for assembly systems under random demands”, Operations Research 37, 565–579.

Rota, K., Thierry, C., Bel, G. (1997), “Capacity-constrained MRP system: A mathematical programming model integrating firm orders, forecasts and suppliers”, Departament d’Automatique, Universite Toulouse II Le Mirail.

Saad, G.H. (1982), “An overview of production planning models: Structural classification and empirical assessment”, International Journal of Production Research, 20, 105-114.

Samanta, B., Al-Araimi, S.A. (2001), “An inventory control model using fuzzy logic”, International Journal of Production Economics 73, 217–226.

Schild, A. (1959), “On inventory, production and employment scheduling”, Management Science 5, 157-167.

Schumann Consortium, (1998), “Supply chain uncertainty management network optimization”, Esprit Programme. Full Proposal 26267.

Schwarz, L,B., and Johnson, R.E. (1978), “An appraisal of the empirical performance of the Linear Decision Rule for aggregate planning”, Management Science 24, 844-849.

Sethi, S.P., Yan, H., Zang, Q. (2002), “Optimal and hierarchical controls in dynamic stochastic manufacturing systems: A survey”, Manufacturing and Service Operations Management 4, 133–170.

Sheu, J. B. (2008). Green supply chain management, reverse logistics and nuclear power generation. Transportation Research Part E: Logistics and Transportation Review, 44(1), 19-46.

Shi, Y., Haase, C.,(1996). Optimal trade-offs of aggregate production planningwith multiple objective and multi-capacity demand levels. International Journal of Operations and Quantitative Management 2(2),127–143.

Singhal, K., and Adlakha, V. (1989), “Cost and shortage trade-offs in aggregate production planning”, Decision Science 20, 158-164.

Silver, E.A. (1972), “Medium range aggregate production planning: State of the art”, Journal of Production and lnventory Management 13, 15-38.

Sobel, M.J. (1970), “Smoothing start-up and shut-down costs: Concave case”, Management Science 17, 78-91.

Sommer, G. (1981), “Fuzzy inventory scheduling”, In: Lasker, G.E. (Ed.), Applied Systems and Cybernetics, vol. VI. Academic Press, New York.

Soyster, A. L., (1973).“Convex programming with set-inclusive constraints and applications to inexact linear programming”, Oper. Res. 21 1154–1157,

Srivastava, S. (2007). Green supply-chain management: A state-of-the-art literature review. International Journal of Management Reviews, 9(1), 53-80.

Tang, Ou ,  and Robert W. Grubbström, (2002), Planning and replanning the master production schedule under demand uncertainty, International Journal of Production Economics, 78(3), 323-334

Taubert, W.H. (1968), “A search decision rule for the aggregate scheduling problem”, Management Science 14, 343- 359.

Thompson, S.D., Davis, W.J. (1990), “An integrated approach for modeling uncertainty in aggregate production planning”, IEEE Transactions on Systems, Man and Cybernetics 20, 1000–1012.

Thompson, S.D., Watanabe, D.T., Davis, W.J. (1993), “A comparative study of aggregate production planning strategies under conditions of uncertainty and cyclic product demands”, International Journal of Production Research 31, 1957–1979.

Tsai, Jung-Fa (2007). An optimization approach for supply chain management models with quantity discount policy, European Journal of Operational Research, 177,982–994

Tsai T. and Sato R., (2004). A UML model of agile production planning and control system, Computers in Industry 53(2), 133-152.

Tuite, M.F. (1968), “Merging marketing strategy selection and production scheduling”, Journal of Industrial Engineering 19, 76-84.

Turksen, I.B. (1988a), “Approximate reasoning for production planning”, Fuzzy Sets and Systems 26, 23–37.

Turksen, I.B. (1988b), “An approximate reasoning framework for aggregate production planning”, In: Turksen, I.B. (Ed.), Computer Integrated Manufacturing, NATO ASI SERIES, vol. 49. Springer, Berlin, pp. 243–266.

Van de Panne, C., and Bosje, P. (1962), “Sensitivity analysis of cost coefficient estimates: The case of Linear Decision Rules for employment and production”, Management Science 9, 82-107.

Van Houtum, G.J., Inderfurth, K., Zijm, W.H.M. (1996), “Materials coordination in stochastic multi-echelon systems”, European Journal of Operational Research 95, 1–23.

Veinott, A.F. (1964), “Production planning with convex costs: A parametric study”, Management Science 10, 441-460.

Veinott, A.F. (1969), “Minimum concave-cost solution of leontief substitution models of multi-facility inventory systems”, Operations Research 17, 262-291.

Vergin, R.C. (1966), “Production scheduling under seasonal demand”, Journal of Industrial Engineering 17, 260-266.

Vergin, R.C. (1980), “On ‘A new look at production switching heuristics for the aggregate planning problem”, Management Science 26, 1185-1186.

Vollmann, T.E. (1973), “Capacity planning: The missing link”, Journal of Production and Inventory Management 14, 61 – 73.

Vujosevic, M., Petrovic, D., Petrovic, R. (1996), “EOQ formula when inventory cost is fuzzy”, International Journal of Production Economics 45, 499–504.

Wacker, J.G. (1985), “A theory of material requirements planning (MRP): An empirical methodology to reduce uncertainty in MRP systems”, International Journal of Production Research 23, 807–824.

Wang, F., Lai, X., & Shi, N. (2011). A multi-objective optimization for green supply chain network design. Decision Support Systems, 51(2), 262-269.

Wang, R., Fang, H. (2001), “Aggregate production planning with multiple objectives in a fuzzy environment”, European Journal of Operational Research 133, 521–536.

Wang R., Liang T. (2005), “Applying possibilistic linear programming to aggregate production planning”, Int. J. Production Economics 98, 328–341.

Ward, T.L., Ralston, P.A.S., Davis, J.A. (1992), “Fuzzy logic control of aggregate production planning”, Computers and Industrial Engineering 23, 137–140.

Welam, U.P. (1976), “Comments on goal programming for aggregate planning”, Management Science 22, 708-712.

Werners, B. (1987), “An interactive fuzzy programming system”, Fuzzy Sets and Systems 23, 131–147.

Weston, F.C. (1974), “Mathematical programming and aggregate production planning in a multi-organizational system”, Journal of Production and Invenlory Management, 15, 37-44.

Wijngaard, J., Wortmann, J.C. (1985), “MRP and inventories”, European Journal of Operations Research 20, 281–293.

Wilhelm, J. (2000), “Controlling production dynamics—managing uncertainties with automatic production control”, International Journal of Production Research 38, 4235–4246.

Winters, P.R. (1962), “Constrained inventory rules for production smoothing”, Management Science 8, 470-481.

Wu, C.C., Chang, N.B., (2004).Corporate optimal production planning with varying environmental costs: A grey compromise programming approach, European Journal of Operational Research, 155,68–95

Wu, D. Ierapetritou, M., (2007). Hierarchical approach for production planning and

scheduling under uncertainty, Chemical Engineering and Processing 46, 1129–1140

Xie, J., Zhao, X., Lee, T.S. (2003), “Freezing the master production schedule under single resource constraint and demand uncertainty”, International Journal of Production Economics 83, 65–84.

Yan, HS., (2001).  Hierarchical stochastic production planning for the highest business benefit, Robotics and Computer Integrated Manufacturing, 17(5), 405-419.

Yano, C.A. (1987), “Stochastic lead times in two-level assembly systems”, IIE Transactions 19, 371–377.

Yano, C.A., Lee, H.L. (1995), “Lot sizing with random yields: A review”, Operations Research 43, 311–334.

Yeh, W. C. & Chuang, M. C. (2011). Using multi-objective genetic algorithm for partner selection in green supply chain problems. Expert Systems with Applications, Article in Press.

Yin, G.  Zhang, Q. and  Badowski G. (2003). Discrete-time singularly perturbed Markov chains: Aggregation, occupation measures, and switching diffusion limit, Adv. in Appl. Probab. 35, , 449-476.

Zadeh, L.A. (1965), “Fuzzy sets”, Information Control 8, 338–353.

Zangwill, W.I. (1966a), “A deterministic multiproduct, multifacility production and inventory model”, Operations Research,14, 486-507.

Zangwitl, W.I. (1966b), “A deterministic multiperiod production scheduling model with backlogging”, Management Science 13, 105-119.

Zangwilt, W.I. (1966c), “Production smoothing of economic lot sizes with non-decreasing requirements”, Management Science 13, 191-209.

Zapfel, G. (1996), “Production planning in the case of uncertain individual demand”, Extension for an MRP. International Journal of Production Economics 46–47, 153–164.

Zijm, W.H.M. (1992), “Hierarchical production planning and multi-echelon inventory management”, International Journal of Production Economics 26, 257–264.

Zijm, W.H.M. (2000), “Towards intelligent manufacturing planning and control systems”, OR Spektrum 22, 313–345.

Zimmermann, H.J., Zysno, P. (1980), “Latent connectives in human decision making”, Fuzzy Sets and Systems 4, 37–51.

Zhu, Q., & Sarkis, J. (2011). Relationships between operational practices and performance among early adopters of green supply chain management practices in Chinese manufacturing enterprises. Journal of Operations Management, 22(3), 265-289.

 

BlueStar Diabetes Management System

 

 

Reliability Modeling and Management In Mobile Devices

Reviews

There are no reviews yet.

Be the first to review “CPLEX Code of PhD thesis (Multi Objective Robust Aggregate Production Planning in a Supply Chain under Uncertainty)”