Sequence subsystem should be directly connected to DUT subsystem. Check the order of the input arguments. The specified
Posted: Sun Mar 14, 2021 12:05 pm
Sequence subsystem should be directly connected to DUT subsystem. Check the order of the input arguments. The specified UVM mapping was but based on connectivity the suggested UVM mapping should be
uvmgenerator
uvmgenerator