Page 1 of 1

Baseline controller must have the same sample time as the plant (Ts = )

Posted: Mon Mar 08, 2021 12:03 pm
by esmatparast
Baseline controller must have the same sample time as the plant (Ts = )

Plant model must not have unspecified sample time (Ts = -1).


pidtool